Period |
Country |
Project / Wind farm |
Type |
Amount WTG |
|
Work performed |
May 2021 |
South Korea |
Youngil |
Wind |
< 100 MW |
|
Bankable Wind resource assessment and energy yield study |
May 2021 |
South Korea |
Hongcheon Wind Farm |
Wind |
50 MW |
|
Contract Negotiation for Wind Turbine Supply and O&M contracts |
May 2021 |
Denmark |
Thor Wind Farm |
Wind Offshore |
800 MW |
|
Consultancy for grid connection design during tendering phase |
Jun 2021 |
Germany |
Ostharingen Wind Farm |
Wind |
80 MW |
|
Turn-key project development including transportation study, technical engineering and financing, project management, provide building permit (BImSchG), |
Jun 2021 |
Marocco |
Taza Wind Farm |
Wind |
97 MW |
|
Grid study including load flow, short circuit and reactive power calculations |
Jun 2021 |
Sudan |
Toker Wind Farm |
Wind |
180 MW |
|
Update of feasibility study, drawings for substation, internal cabling and grid connection layout |
Nov 2021 |
South Korea |
Yangyang Suri Wind Farm |
Wind |
90 MW |
|
Contract Negotiation for Wind Turbine Supply and O&M contracts |
Dec 2021 |
Azerbaijan |
Absheron Offshore Wind Farm |
Wind Offshore |
200 MW |
|
Pre-Feasibility Study/AEP estimation |