Logo Terrawatt Planungsgesellschaft mbH

Terrawatt Planungsgesellschaft mbH
Poetenweg 49 | 04155 Leipzig
Telefon: +49 341 562970 | Fax: +49 341 5629719
info@terrawatt.de
Logo ESCEM asbl

  • 메인화면
  • 회사소개
    • 연혁
    • 찾아오시는 길
    • 조직구성
    • 품질경영
  • 사업소개
    • 풍력발전
    • 태양광발전
    • 인증서
    • 에너지 계획
  • 사업실적
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
    • 2006
    • 2005
    • 2004
    • 2003
    • 2002
  • 갤러리
  • 고객문의
  • 연락처

2011

Planning, administration and supervision activities

Period Country Project / Wind farm Type Amount WTG Work performed
Jan 2011 France Coquelicot Wind wind measurement / data analysis / long term correction
Jan 2011 South Korea Gang Won Wind 98,9 MW maintenance inspection
Jan 2011 Germany Droyßig and Kayna Wind 6,0 MW creation SDL old plants report
Jan 2011 France Vallermosa Wind 9,2 MW wind measurement/ data analysis/long term correction/modelling/uncertainty and risk analysis
Mar 2011 France Champagne Wind 12,3 MW electrical engineering
Mar 2011 France B-L-A WMM Wind wind measurement
Mar 2011 Germany Gornau PV 2,7 MWp electrical engineering and construction
Mar 2011 Germany Schleenhain Wind 9,0 MW electrical RFP, wind measurement, park layout, electrical engineering
Mar 2011 Germany Tautenhain Wind 80,0 kW turn-key repowering
Apr 2011 Bulgaria Dobrotich Wind 84,0 MW project planning
Apr 2011 South Korea Gochang PV 15,0 MWp due diligence
Apr 2011 Romania Sacele Wind 102,0 MW due diligence electrical
Apr 2011 Turkey div. Locations Wind improvement electrical layout
Apr 2011 Romania Baia Wind 10,0 MW site supervision
Apr 2011 Germany Diepenau Wind 6,0 MW cable routing
May 2011 Italy Lizzano PV 1,0 MWp electrical engineering and construction
May 2011 Germany Nußbaum Wind 32,0 MW electrical engineering and repowering
Jun 2011 Romania Pantelimon Wind 150,0 MW electrical due diligence
Jun 2011 South Korea Gawip Wind 98, MW inspection
Jun 2011 Romania 4 wind farms Wind 13,6 MW due diligence, grid connection
Jun 2011 Romania Sabloal Wind 208,0 MW electrical RFP
Jul 2011 Romania Mircea Voda Wind 8,0 MW due diligence
Aug 2011 France SRS Wind wind measurement
Oct 2011 France MIR Wind wind measurement
Nov 2011 Germany Erlau Wind 6,0 MW creation declaration of conformity
Dec 2011 Romania Fantanele Wind 347,5 MW construction of wind farm management
Dec 2011 Germany Ramsdorf Wind 6,9 MW creation declaration of conformity
Dec 2011 Germany Rossau Wind 6,0 MW creation declaration of conformity