Logo Terrawatt Planungsgesellschaft mbH

Terrawatt Planungsgesellschaft mbH
Poetenweg 49 | 04155 Leipzig
Telefon: +49 341 562970 | Fax: +49 341 5629719
info@terrawatt.de
Logo ESCEM asbl

  • 메인화면
  • 회사소개
    • 연혁
    • 찾아오시는 길
    • 조직구성
    • 품질경영
  • 사업소개
    • 풍력발전
    • 태양광발전
    • 인증서
    • 에너지 계획
  • 사업실적
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
    • 2006
    • 2005
    • 2004
    • 2003
    • 2002
  • 갤러리
  • 고객문의
  • 연락처

2008

Planning, administration and supervision activities

Period Project / Wind farm Amount
WTG
Type Work performed
02.2008Sotterhausen3MWWTGGrid connection & construction supervision
03.2008Peschany23MWWTGConceptual design
04.2008Trebsen38KWPVFeasíbility study for a photovoltaik system
05.2008Saint-Paul-du-Vernay/ France--WTGWind measurements
05.2008Carnoet/ France--WTGWind measurements
06.2008Treffendel/ France--WTGWind measurements
07.2008Ngong/ Kenya50MWWTGFeasibility study
07.2008Kinangop/ Kenya--WTGFeasíbility study for grid connection
08.2008Haouma/ Morocco80MWWTGFeasibility study for the electrical engineering
09.2008Ashegoda/ Ethiopia120MWWTGDue diligence for a transformer station
10.2008Kardan/ Bulgaria9MWWTGExamination of wind potential, energy yield, electrical infrastructure, constructional part and wind turbine generator specification. Examination of project management
10.2008several sites/ Italy WTGPlanerstellung interne Verkabelung Windpark, parkinterne Grobmessung UW, technische Dokumentation
10.2008Schlalach23MWWTGElectrical infrastructure
10.2008Vogelsberg7,5MWWTGSafety and health coordination. Delivery of power distributer station. Inspection & acceptance of foundations, grid connection & construction supervision
10.2008Catalca/ Turkey250MWWTGSelection of potential wind farm sites, pre feasibility study, project development
11.2008Bandirma/ Turkey60MWWTGDue Diligence
11.2008Tramelan/ Swiss17MWWTGCompilation of the connection schemes. Dimensioning of the power cable for grid connection
11.2008Tarfaya/ Morocco300MWWTGAnalysis of wind data, conditioning and long term classification. Conceptual design of the electrical layout. Project checkup and data analysis