Logo Terrawatt Planungsgesellschaft mbH

Terrawatt Planungsgesellschaft mbH
Poetenweg 49 | 04155 Leipzig
Telefon: +49 341 562970 | Fax: +49 341 5629719
info@terrawatt.de
Logo ESCEM asbl

  • 메인화면
  • 회사소개
    • 연혁
    • 찾아오시는 길
    • 조직구성
    • 품질경영
  • 사업소개
    • 풍력발전
    • 태양광발전
    • 인증서
    • 에너지 계획
  • 사업실적
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
    • 2006
    • 2005
    • 2004
    • 2003
    • 2002
  • 갤러리
  • 고객문의
  • 연락처

2010

Planning, administration and supervision activities

Period Country Project /
Wind farm
Type Amount
WTG
Work performed
Jan 2010 Germany Zorbau Wind 9.2 MW construction management
Mar 2010 Germany Schkortitz Wind 800.0 kW turn key repowering
Mar 2010 Poland Batkowo WEA 5.6/5.95/6,0 MW wind measurement/ data analysis/long term correction/modelling/uncertainty and risk analysis
Mar 2010 Czech Republic Podborany PV 582.0 kWp technical engineering roof mounted
Mar 2010 Turkey Sares Wind 22.5 MW planning and construction of the wind farm
Mar 2010 Turkey Karadag Wind 10.0 MW planning and construction of the wind farm
Mar 2010 Turkey Güney Wind 27.5 MW planning and construction of the wind farm
Mar 2010 Turkey Gök Wind 27.5 MW planning and construction of the wind farm
Mar 2010 Turkey Kale Wind 55.0 MW planning and construction of the wind farm
May 2010 Azerbaijan Shurabad Wind 40.0 MW wind measurement/ data analysis/long term correction/modelling/uncertainty and risk analysis
Jun 2010 Germany Wundersleben Wind 10.0 MW electrical engineering grid connection
Jun 2010 Germany Tautenhain Wind 0.8 MW wind potential and yield analysis
Jun 2010 Germany Zorbau Wind 9.2 MW planning and construction of the wind farm
Jun 2010 Germany Sotterhausen Wind 4.0 MW electrical engineering grid connection
Jul 2010 France Coquelicot Wind - wind measurement
Aug 2010 Germany Wählitz PV 17.2 MWp conceptual planning
Aug 2010 Germany Kleinbrembach Wind 10.0 MW electrical engineering grid connection
Aug 2010 France Amiens Wind - wind measurement / data analysis / long term correction
Oct 2010 Poland Kuslin Wind 660.0 MW electrical engineering, Due Diligence, grid connection
Oct 2010 Germany Schkortitz Wind 800.0 kW turn key repowering
Oct 2010 South Korea Gawip Wind 98.0 MW inspection
Oct 2010 Romania Fantanele Wind 347.5 MW Start up of O&M of a wind farm
Oct 2010 Germany Saxony Wind - landscape modelling and micrositing of a open cast mining for future wind farms
Oct 2010 Feance Troyes Wind - wind measurement / data analysis / long term correction
Nov 2010 Romania Mihai Viteazu Wind - electrical due diligence
Dec 2010 Nigeria Katsina Wind 10.2 MW owners engineer
Dec 2010 Ethiopia Ashegoda Wind 120.0 MW electrical review, site visit
  • 회사소식

  • 보도자료

  • 채용정보



Copyright © 2020 www.terrawatt.de

Design by Reichelt Kommunikationsberatung