Logo Terrawatt Planungsgesellschaft mbH

Terrawatt Planungsgesellschaft mbH
Poetenweg 49 | 04155 Leipzig
Telefon: +49 341 562970 | Fax: +49 341 5629719
info@terrawatt.de
Logo ESCEM asbl

  • 메인화면
  • 회사소개
    • 연혁
    • 찾아오시는 길
    • 조직구성
    • 품질경영
  • 사업소개
    • 풍력발전
    • 태양광발전
    • 인증서
    • 에너지 계획
  • 사업실적
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
    • 2006
    • 2005
    • 2004
    • 2003
    • 2002
  • 갤러리
  • 고객문의
  • 연락처

2013

Planning, Administration, and Control Activities.

Period Country Project / Wind farm Type Amount WTG Work performed
Feb 2013 Poland Bakaniuk Wipo+EY Wind 6,0 MW Site visit, data analysis, wind potential and energy yield assessment
Mar 2013 Germany Streumen wind farm Wind 6,0 MW preperation expert report, documentation review, site visit
Mar 2013 Germany Erlau wind farm Wind 3.0 MW preperation expert report, documentation review, site visit
Mar 2013 Italy Tramatza Wipo+EY Wind 4,8 MW data analysis, wind potential and energy yield assessment
Mar 2013 Japan Tohoku PV PV 40.0 MWp due diligence of system design, energy yield assessment
Apr 2013 Germany Demmin Photovoltaik PV 0.5 MWp preperation expert report, documentation review, harmonic calculation
May 2013 Germany substation hand over inspection WF Neuruppin Wind 31,5 MW handover inspection with punch list
Jun 2013 Romania Foltesti wind farm Wind 10.0 MW due diligence
Jun 2013 Vietnam WMM Phu Lac Wind development of a concept for the design, the instrumentation and the position of a WMM
Jul 2013 Romania Foltesti II wind farm Wind 10.0 MW due diligence
Sep 2013 Germany Rotor Blade Angle Determination Wind Development of an optical system for the identification of the relative rotor blade angles
Sep 2013 Germany Survey of shadow and noise immissions wind farm Profen Wind 21,6 MW prediction of shadow and noise immissions windfarm in the vicinity
Sep 2013 Romania PWP wind farm Wind 18,0 MW data analysis, wind potential and energy yield assessment
Nov 2013 South Korea Kimnyeong wind farm Wind 30,o MW feasibility study, owners engineer
Dez 2013 Nigeria Igbokoda wind farm Wind 22.0 MW feasibility study electrical part
  • 회사소식

  • 보도자료

  • 채용정보



Copyright © 2020 www.terrawatt.de

Design by Reichelt Kommunikationsberatung