Logo Terrawatt Planungsgesellschaft mbH

Terrawatt Planungsgesellschaft mbH
Poetenweg 49 | 04155 Leipzig
Telefon: +49 341 562970 | Fax: +49 341 5629719
info@terrawatt.de
Logo ESCEM asbl

  • Home
  • Company
    • History
    • Location
    • Team
    • Quality Statement
  • Profile
    • Wind energy
    • Photovoltaic
    • Certificate
    • Energy Planning
  • References
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • 2010
    • 2009
    • 2008
    • 2007
    • 2006
    • 2005
    • 2004
    • 2003
    • 2002
  • Gallery
  • Contact
  • Imprint

5 1 2 3

2012

Planning, Administration, and Control Activities.

Period Country Project / Wind farm Type Amount WTG Work performed
Jan 2012 Germany Eckolstädt Wind 9.2 MW wind potential and yield analysis
Jan 2012 Romania Caras Severin Wind 200.0 MW due diligence electrical
Jan 2012 Romania Topalu-Crucea Wind 249.0 MW due diligence electrical
Jan 2012 Marocco Haouma, Foum el Oued, Akhfenir Wind 200.0 MW document review of electrical documentation
Jan 2012 Romania Oravita Wind 9.0 MW due diligence
Jan 2012 Romania Pecineaga Wind 50.0 MW due diligence electrical
Jan 2012 Germany due diligence electrical Wind 42.0 MW turn-key project
Feb 2012 Germany Oranienburg PV 160.0 MWp technical engineering roof mounted
Mar 2012 Germany Merseburg PV 120.0 MWp technical engineering roof mounted
Mar 2012 Romania Toplet Wind 54.0 MW due diligence electrical
Apr 2012 Romania Tortomanu 3 Wind 8.0 MW site supervision
Apr 2012 Romania Tortomanu 1 Wind 6.0 MW due diligence project
Apr 2012 Romania Independenta Wind 231.7 MW due diligence electrical
May 2012 Germany Profen Wind feasibility study and grid connection concept
May 2012 Germany Wundersleben Wind 10.0 MW site supervision erection compensaiton equipment
May 2012 Germany Jesewitz Wind 2.3 MW electrical engineering gridconnection, site supervision
Sep 2012 France Cirey-les-Mareilles Wind wind measurement campaign
Sep 2012 Italy Tramatza Wind wind measurement campaign
Oct 2012 Germany Niederheide Wind 11.5 MW energy loss calculation, internal cable design
Oct 2012 Korea YoungwolPV40.0 MWp due diligence
Nov 2012 Romania Dulcesti Wind 20.0 MW due diligence and construction monitoring
  • News

  • Press

  • Jobs


 
 
 

Copyright © 2020 www.terrawatt.de | Privacy Policy

Design by Reichelt Kommunikationsberatung