| 10.2001-04.2002 | Rehbach | 1 | Vestas V52 | Design and construction of the electrical infrastucture. Electrical cabling |
| 02.2003 |
Ketzin II |
4 |
Enercon E66/18.70 |
Design and construction of the electrical infrastucture. Electrical
cabling. Project supervision |
| 03.2003-06.2003 |
Zorbau |
2 |
Enercon E66/18.70 |
Electrical cabling. Project supervision |
| 03.2003-09.2003 |
Bielefeld |
1 |
Enercon E66/18.70 |
Technical planning. Tender Project supervision |
| 04.2003 | Langenrieth/ Martinskirchen | 3 | NEG Micon | Design and construction of the electrical infrastucture. Electrical cabling |
| 06.2003-12.2003 |
Bageritz |
2 |
Vestas V 80 |
Technical planning.Electrical cabling. Project supervision |
| 06.2003 |
Rastenberg-Roldisleben |
4 |
NEG Micon |
Design and construction of the electrical infrastucture. Electrical
cabling |
| 07.2003 |
Rassnitz II |
1 |
Enercon E 58 |
Design and construction of the electrical infrastucture. Electrical
cabling |
| 07.2003 |
Döbernitz |
1 |
Enercon E 66/18.70 |
Technical planning. Electrical cabling. Project supervision |
| 09.2003-12.2003 |
Bageritz |
3 |
Vestas V80 |
Design and construction of the electrical infrastucture. Electrical cabling. Project supervision |