2017 |
Planning, Administration and Control Activities.
Period |
Country |
Project / Wind farm |
Type |
Amount WTG |
|
Work performed |
Mar 2017 |
South Korea |
Yeongdeuk |
Wind |
97.2 MW |
|
Energy yield study |
Mar 2017 |
Egypt |
BOO |
Wind |
250.0 MW |
|
Grid calculation, Documentation review, SCADA planning |
Apr 2017 |
Germany |
Weichensdorf |
PV |
1.03 MW |
|
Confirmity test acc grid code |
Jun 2017 |
Germany |
Peckelsheim |
Wind |
14.4 MW |
|
Grid calculation |
Jul 2017 |
Germany |
Schenklengsfeld |
Wind |
9.9 MW |
|
Construction permit support |
Jul 2017 |
South Korea |
Samcheok |
Wind |
39.6 MW |
|
Energy yield study |
Jul 2017 |
South Korea |
Nodong |
Wind |
2.3 MW |
|
Energy yield study |
Aug 2017 |
Germany |
Sachsen-Anhalt |
Wind |
- |
|
Repowering potencial calculation |
Sep 2017 |
Germany |
Weinstraße (Thüringen) |
Wind |
36.2 MW |
|
Noise study |
Sep 2017 |
Philippines |
siquijor |
Wind |
19.2 MW |
|
Energy yield study |
Oct 2017 |
France |
H2air- FLC |
Wind |
- |
|
WMM Inspection |
Oct 2017 |
Germany |
Dummerstorf OT Schlage |
Wind |
9.0 MW |
|
Energy yield study |
Nov 2017 |
Germany |
Sachsen, Thüringen, Sachsen-Anhalt, Brandenburg |
Wind |
- |
|
Wind potential assessment |
|