Period |
Project / Wind farm |
Amount
WTG |
Type |
Work performed |
02.2008 | Sotterhausen | 3MW | WTG | Grid connection & construction supervision |
03.2008 | Peschany | 23MW | WTG | Conceptual design |
04.2008 | Trebsen | 38KW | PV | Feasíbility study for a photovoltaik system |
05.2008 | Saint-Paul-du-Vernay/ France | -- | WTG | Wind measurements |
05.2008 | Carnoet/ France | -- | WTG | Wind measurements |
06.2008 | Treffendel/ France | -- | WTG | Wind measurements |
07.2008 | Ngong/ Kenya | 50MW | WTG | Feasibility study |
07.2008 | Kinangop/ Kenya | -- | WTG | Feasíbility study for grid connection |
08.2008 | Haouma/ Morocco | 80MW | WTG | Feasibility study for the electrical engineering |
09.2008 | Ashegoda/ Ethiopia | 120MW | WTG | Due diligence for a transformer station |
10.2008 | Kardan/ Bulgaria | 9MW | WTG | Examination of wind potential, energy yield, electrical infrastructure, constructional part and wind turbine generator specification. Examination of project management |
10.2008 | several sites/ Italy | | WTG | Planerstellung interne Verkabelung Windpark, parkinterne Grobmessung UW, technische Dokumentation |
10.2008 | Schlalach | 23MW | WTG | Electrical infrastructure |
10.2008 | Vogelsberg | 7,5MW | WTG | Safety and health coordination. Delivery of power distributer station. Inspection & acceptance of foundations, grid connection & construction supervision |
10.2008 | Catalca/ Turkey | 250MW | WTG | Selection of potential wind farm sites, pre feasibility study, project development |
11.2008 | Bandirma/ Turkey | 60MW | WTG | Due Diligence |
11.2008 | Tramelan/ Swiss | 17MW | WTG | Compilation of the connection schemes. Dimensioning of the power cable for grid connection |
11.2008 | Tarfaya/ Morocco | 300MW | WTG | Analysis of wind data, conditioning and long term classification. Conceptual design of the electrical layout. Project checkup and data analysis |