2007 |
Planning, administration and supervision activities
Period |
Project / Wind farm |
Work performed |
01.2007 | Petelia, Italy | Analysis wind data | 02.2007 | Ashegoda/ Ethiopia | Planning electric power transformation substation | 03.2007 | Raßnitz | Design and construction of the electrical infrastructure | 05.2007 | Ablaß/Sitten | Amelioration Windpark | 05.2007 | Ablaß | Analysis wind data | 05.2007 | Norsk Hydro | Offshore-study | 06-10.2007 | Threna | Cable laying | 07-12.2007 | Gangwon/Korea | Inspection 49 windmills | 08.2007 | Ebersheim | Crid connection | 12-12..2007 | BHKW Hettstedt | Planning BHKW | 10-12.2007 | BHKW Hettstedt | Editing and analysis wind data | 11-12.2007 | PV-Korea | Survey roof area | 12.2007 | Pakistan | Feasibility study | 12.2007 | Msene Lasne | Planning electric power transformation substation | 12.2007 | Iven | Editing and analysis wind data |
|